275 KV OVERHEAD TRANSMISSION LINES GALANG - BINJAI (80 KM) NORTH SUMATERA
COMPLETED PROJECT
275 KV OVERHEAD TRANSMISSION LINES GALANG - BINJAI (80 KM) NORTH SUMATERA

275 KV OVERHEAD TRANSMISSION LINES GALANG - BINJAI (80 KM) NORTH SUMATERA



• Owner: PT. PLN (Persero) UIP II

• Source of Fund : APLN

• Design, supply, construction of 275 kV double circuit transmission line Sumatera Interconnection System.

• 141 towers, 55.45 km route length of Foundation and Tower for Transmission Line, from Galang to Binjai.
(Exclude Stringing)