• 150 kV double circuits three-phase transmission line, 64 km long, from the outdoor switchyard of No.1 via the outdoor switchyard of No.2. • 11 km long from the outdoor switchyard of No.1 Power Station to the new 150 kV Takengon Substation. • New construction of 150kV Takengon Substation and Extension of existing Bireuen Substation. • Fiber optic communication system between Takengon and Bireuen Substations.