Other Information Foto Header Banner banner1 5a6f3 1815 84
Logo
Peusangan 1&2 HEPP Lot IV: 150 kV Transmission Line and Substations
CURRENT PROJECT
Peusangan 1&2 HEPP Lot IV: 150 kV Transmission Line  and Substations

Peusangan 1&2 HEPP Lot IV: 150 kV Transmission Line and Substations



• 150 kV double circuits three-phase transmission line, 64 km long, from the outdoor switchyard of No.1 via the outdoor switchyard of No.2.
• 11 km long from the outdoor switchyard of No.1 Power Station to the new 150 kV Takengon Substation. 
• New construction of 150kV Takengon Substation and Extension of existing Bireuen Substation.
• Fiber optic communication system between Takengon and Bireuen Substations.
Back
Other Information Footer Copyright peusangan aceh
Head Office:
Telp. 62-021-7361979
Fax. 62-021-7362003
Jl. RC Veteran No. 4
Bintaro Jakarta 12330, Indonesia
email: business@bbsi.co.id
Other Information Footer Copyright peusangan aceh
Copyright © 2017 - Berca Buana Sakti All Rights Reserved,
Jasa Pembuatan Website by IKT